Primary source: TN Single Window Portal — RL_54: Issue of NOC for Bank Mortgage Purpose by SIPCOT (procedure, checklist and fees) · Dated 25 Oct 2026. Rates, schemes and circulars change — verify on the official page before you act.
Primary source: TN Single Window — RL_54 PDF (Issue of No Objection Certificate (NOC) for Bank Mortgage Purpose by State Industries Promotion Corporation of Tamil Nadu (SIPCOT)). News peg: The Hindu, 23 Oct 2026 — industries in Chennai’s SIPCOT parks flag infrastructure gaps (Vallam Vadagal and Irungattukottai; infrastructure concerns only — not a change to the mortgage-NOC procedure).
Why this comes up for a ₹5 Cr+ file
SIPCOT industrial plots are leasehold. When a lender wants the plot (and often the building) as security for a loan against property or a working-capital facility, perfecting that mortgage usually needs SIPCOT’s NOC after sanction. Units in parks such as Vallam Vadagal and Irungattukottai have been in the news over power, roads and water (The Hindu, 23 Oct 2026); that infrastructure story is separate from the mortgage-NOC process, but it is a reminder that many Chennai-belt factories sit on SIPCOT leasehold land where this step applies.
An NOC does not assure sanction or disbursement.
What RL_54 says (official procedure)
From the TN Single Window RL_54 PDF (procedure, checklist and fees):
Fee
- Application fees — INR 5,000 + GST.
Scrutiny window (not a full turnaround promise)
- After online filing on the Single Window Portal (SWP), upload of supporting documents, fee payment and submission, the Assistant Manager – Projects scrutinises the application and supporting documents.
- The flowchart marks that scrutiny step within 7 days, with queries raised if clarifications are required.
- Later steps (dues demand, management-change path, issue of NOC by GM Projects / Managing Director, download of the NOC) are on the same chart — do not read the 7-day box as “NOC in 7 days.”
Checklist of supporting documents (RL_54 §2)
- List of directors / shareholding pattern of the company at the time of allotment and as on date, duly certified by a CA/CPA
- Audited annual reports / audited balance sheet and P&L of the last 3 years
- Proof of change of management of the company (if any)
- Proof of listed NBFC (mandatory if the NOC is required in favour of an NBFC)
- Bank’s sanction letter (with terms and conditions) providing details of credit facilities sanctioned and the properties to be mortgaged
- Details of properties to be mortgaged
- NOC from SIPCOT (mandatory if an NOC was earlier issued to a bank by SIPCOT)
- No Due Certificate (mandatory if an NOC was earlier issued to a bank by SIPCOT)
- Modified lease deed (mandatory in case of change in management of the entity)
- Consent to Operate from the Tamil Nadu Pollution Control Board
If management has changed
- RL_54’s flowchart: after review (including audited annual report and change of management), if there is a change in management structure, SIPCOT raises a demand for payment of differential plot cost and a request for modification of the lease deed.
- The chart asks whether payment and execution / registration of the modified lease deed were completed within 30 days.
- Until that path is cleared, the NOC does not simply sail through the “no management change” branch.
Earlier NOC already on the plot
- If SIPCOT earlier issued an NOC to a bank, the checklist requires the prior SIPCOT NOC and a No Due Certificate. Align filing with your lender’s takeover / enhancement instructions and with whatever SIPCOT asks for those two documents.
What to do before you apply
- Confirm the product needs a plot mortgage. Some pure unsecured or movable-security structures do not — your sanction letter decides.
- Get the sanction letter wording right. RL_54 wants the bank’s sanction with T&Cs and the properties to be mortgaged named.
- CA check on shareholding vs allotment. Directors/shareholding “at allotment” vs “as on date” is item 1 — a management change can trigger differential plot cost.
- TNPCB CTO — keep Consent to Operate current; it is on the official checklist.
- If switching lenders or enhancing where an earlier SIPCOT NOC exists — gather the earlier NOC and No Due Certificate before filing.
- Budget time for queries. The 7-day box is scrutiny only. RL_54 also shows clarification and dues steps after that — allow for those before the NOC is issued.
Contact for a file review.
Review date: 25 Nov 2026 (recheck TNSWP RL_54 and SIPCOT process notes periodically).